Interior Renovation of a 2LDK Apartment in Japan: Wall Preparation and Floor Preparation

Finish coat putty applied over the joints of the living room ceiling boards.

Project Type: Apartment Interior Renovation
Location: Japan
Apartment Size: Approximately 70 m²
Layout: 2LDK
Work Areas: Living Room, Kitchen, Toilet, and Entrance
Crew: 1 Carpenter, 1 Site Supervisor, 3 Wallpaper Installers
Working Time: Approximately 7.5 hours
Customer Status: Vacant apartment
Main Work: Gypsum Board Installation, Wallpaper Removal, Wall Preparation, Putty Work, and Cushion Flooring Preparation

TOC

Introduction

Living room area of a vacant 2LDK apartment in Japan before renovation work began.
The apartment before the interior renovation work began.

Today, I worked on the interior renovation of a 2LDK apartment on the second floor of a condominium in Japan.

Interior of a vacant apartment in Japan before wallpaper and ceiling renovation work.
The interior condition of the apartment before the renovation work.

The apartment was approximately 70 square meters and was vacant, so we were able to work throughout the living room, kitchen, toilet, and entrance areas without worrying about disturbing the residents.

Apartment interior before renovation, showing the existing walls and ceiling.
Another view of the apartment before the renovation work started.

There were five people on site: one carpenter, one site supervisor, and three wallpaper installers.

Existing interior of a 2LDK apartment before ceiling, wall, and flooring preparation.
The work area before the interior renovation began.

The carpenter worked on installing new boards on the ceilings and walls, while we prepared the existing surfaces for the new wallpaper and cushion flooring.

The work took approximately seven and a half hours. The wallpaper installation is scheduled for the following day.

Related Project

Wallpaper Installation and Herringbone Cushion Flooring in a 2LDK Apartment

Job Site Report

1. Installing Gypsum Boards

Carpenter installing gypsum boards on the living room ceiling of a Japanese apartment.
A carpenter installing boards on the living room ceiling.

The carpenter started by installing boards on the ceilings and walls.

The framing behind the boards was made of light-gauge steel, and he used a pneumatic nail gun to secure the boards efficiently.

Carpenter working on the installation of ceiling boards in the living room of a 2LDK apartment.
The carpenter continues installing ceiling boards in the living room.

I have installed ceiling boards by myself at my own house before, and I found it difficult to keep the boards straight while maintaining balance.

Newly installed gypsum boards on the entrance ceiling of an apartment in Japan.
Newly installed ceiling boards in the entrance area.

However, the carpenter on this project made the work look surprisingly easy, even though he was working alone.

He has more than 20 years of experience as a carpenter, so watching his technique was a great learning opportunity for me.

2. Removing the Old Wallpaper

While the carpenter worked on the boards, we started removing the old wallpaper.

After removing the wallpaper, we also removed any loose backing paper that remained on the wall.

This step is important because loose backing paper can affect the final finish of the new wallpaper.

We continued preparing the surfaces so they would be ready for the next steps.

3. Applying Base Coat Putty

Base coat putty applied to gypsum board joints on the living room ceiling.
Base coat putty applied to the joints of the living room ceiling boards.

Once the carpenter had installed enough of the new boards, we began applying base coat putty to the joints between the boards.

Base coat putty covering the joints between ceiling boards in the living room.
Base coat putty applied to the living room ceiling.

The quality of the board installation made a big difference.

Because the carpenter had more than 20 years of experience, the boards were installed with very small gaps between them.

Base coat putty applied to the toilet walls and ceiling before wallpaper installation.
Base coat putty applied to the walls and ceiling of the toilet.

This made it easier for us to apply the putty and allowed the work to move smoothly.

When I install boards myself, I sometimes end up with small gaps around the corners.

Living room ceiling with base coat putty applied to the gypsum board joints.
Another view of the base coat putty work on the living room ceiling.

Those gaps require additional putty work, so watching an experienced carpenter showed me how much the quality of the board installation can affect the following wallpaper preparation work.

4. Applying Finish Coat Putty

Finish coat putty applied over the joints of the living room ceiling boards.
Finish coat putty applied to the living room ceiling.

After the base coat putty had dried, we applied finish coat putty.

The purpose of this step was to create a smoother and more even surface before installing the new wallpaper.

Living room walls and ceiling covered with finish coat putty in preparation for wallpaper installation.
Finish coat putty completed on the living room walls and ceiling.

We carefully worked on the board joints and other areas that needed additional leveling.

5. Preparing the Kitchen and Toilet Floors

Putty applied to an uneven area of the kitchen floor before new cushion flooring installation.
Putty applied to uneven areas of the kitchen floor before cushion flooring installation.

The kitchen and toilet floors are scheduled to receive cushion flooring.

There were some uneven areas and differences in level, so we applied putty to those areas to prepare the floor for the new flooring.

Proper floor preparation is important because uneven areas can become visible through cushion flooring after installation.

6. Adjusting the Toilet Entrance

We also had to make an adjustment at the edge of the toilet entrance.

The new cushion flooring would be thick enough to rise above the existing door frame in that area.

To prevent this problem, I carefully removed some of the plywood using a utility knife and then smoothed and leveled the area with a sander.

This adjustment created enough space for the new cushion flooring and helped maintain a clean transition at the entrance.

7. Cleaning Up and Finishing the Day

After all the main putty work was completed, we cleaned the work area.

The surface preparation and floor preparation were finished for the day.

We worked for approximately seven and a half hours.

The wallpaper installation is scheduled for tomorrow.

Related Project

Replacing Water-Damaged Drywall and Rebuilding a Laundry Area Before Wallpaper Installation

Tools Used

Pneumatic Nail Gun

The carpenter used a pneumatic nail gun to efficiently secure the boards to the light-gauge steel framing.

Utility Knife

A utility knife was used for removing old wallpaper and carefully trimming or removing material where necessary.

Putty Tools

Putty knives and other hand tools were used to apply base coat and finish coat putty to the board joints and uneven areas.

Sander

A sander was used to smooth and level the plywood around the toilet entrance.

Cleaning Tools

Cleaning tools were used throughout the project to keep the work area clean and ready for the next stage.

Professional Tips

Good Board Installation Makes Wallpaper Work Easier

The quality of the board installation has a direct effect on the amount of preparation required before wallpaper installation.

When the boards are installed accurately with minimal gaps, the putty work becomes much easier.

Check the Surface Before Applying Wallpaper

Old wallpaper should be removed carefully, and loose backing paper should also be removed.

Even small pieces of loose material can cause problems with the final wallpaper finish.

Pay Attention to Floor Levels

When installing cushion flooring, it is important to check the floor level and surrounding edges before installation.

A small difference in height can become a visible problem after the flooring is installed.

Learn From Experienced Tradespeople

Working alongside experienced craftsmen is one of the best ways to improve practical skills.

In this project, I was able to observe how an experienced carpenter installed ceiling and wall boards efficiently.

Common Mistakes to Avoid

Leaving Loose Backing Paper

Loose backing paper can create an uneven surface underneath new wallpaper.

Always check the wall carefully after removing the old wallpaper.

Ignoring Board Joints

Poorly prepared board joints can become visible through the finished wallpaper.

Make sure the joints are properly filled and smoothed with putty.

Forgetting to Check Floor Levels

Before installing cushion flooring, check transitions, edges, and differences in height.

Ignoring these areas can cause the finished flooring to sit too high or create an uneven transition.

Rushing the Putty Work

Putty needs enough time to dry before the next preparation step.

Rushing the process can make it difficult to achieve a smooth surface.

What I Learned From This Project

One of the biggest things I learned from this project was how much the work of one trade affects the work of another.

The carpenter’s accurate board installation made our wallpaper preparation much easier.

Because the boards had very small gaps, we were able to apply the putty smoothly and efficiently.

I also learned a lot by watching an experienced carpenter work alone.

When I installed ceiling boards at my own house, I found it difficult to keep everything straight while balancing the board.

Watching someone with more than 20 years of experience handle the same type of work made me realize how much experience and technique can improve both speed and accuracy.

Working in an environment where I can learn from other tradespeople is one of the things I really appreciate about my job.

Related Project

Hotel Interior Renovation: Wallpaper, Floor Tile, and Baseboard Installation

FAQ

1. What type of apartment was this project?

This was a 2LDK apartment on the second floor of a condominium in Japan.

2. How large was the apartment?

The apartment was approximately 70 square meters.

3. Was the apartment occupied?

No. The apartment was vacant during the renovation.

4. How many people worked on the project?

There were five people: one carpenter, one site supervisor, and three wallpaper installers.

5. What did the carpenter work on?

The carpenter installed boards on the ceilings and walls using light-gauge steel framing and a pneumatic nail gun.

6. Why was putty applied to the board joints?

Putty was applied to the joints to create a smooth surface before installing the new wallpaper.

7. Why was the floor prepared with putty?

Putty was used to level uneven areas of the kitchen and toilet floors before installing the new cushion flooring.

8. Why did you modify the toilet entrance?

The new cushion flooring would have been thick enough to rise above the existing door frame, so the plywood was adjusted to create enough space.

9. How long did the work take?

The work took approximately seven and a half hours.

10. What was planned for the next day?

The next day’s work was scheduled to be the installation of the new wallpaper.

Related Project

Installing New Flooring and Repairing Drywall in a 70 m² Japanese Apartment

Conclusion

Today’s work focused mainly on preparing the apartment for the next stage of the renovation.

The carpenter installed new boards on the ceilings and walls, while we removed the old wallpaper, prepared the surfaces, applied base and finish coat putty, and prepared the kitchen and toilet floors for cushion flooring.

The experience also reminded me how important cooperation between different trades is.

Good board installation makes wallpaper preparation easier, and careful preparation makes the final finish better.

I was also able to learn from a carpenter with more than 20 years of experience, which made this project especially valuable for me.